Park Royal/ Acton mark up.

Ryan Dewdney • Oct 12, 2023

Park Royal/ Acton mark up.

Durkins and Sons are one of our oldest clients. They contracted us in to survey and markup the utilities along their route for installing new Electric cables in Park Royal/ Acton area. This is an ongoing job for CTS requiring site revisits to mark up further as and when the client requires.

All pipes and cables are traced on site by CTS, and locations are marked in spray paint with depths, sizes, materials, and configurations of the services. All lids in the vicinity are lifted and any pipes which affect the digging route are marked out. The GPR trolley is pushed across the survey area to detect any hyperboles that could indicate an underground pipe, tunnel, or cable.

At the end of each shift, the surveyors complete a CTS utility awareness form, listing which utilities have been found, and do a site walk through with the client to discuss the survey and highlight our findings. The focus is to ensure safe digging for our client.

by AMB 14 Jan, 2024
CTS Rescue Training
by JMB 13 Oct, 2023
ACTS (Alternative Crawler Tunnel System)
Share by: